Alpine MI · Solo Sixty · St Katharine's Case study · 2026
Alpine MI · Est. 2022 sales@alpinemi.co.uk
(N° 09) ProjectSolo Sixty · St Katharine's
SectorLeisure · Fitness
LocationTower Hill · E1
CompletedQ2 2026

Solo Sixty,  St Katharine's.

N° 09 — E1 Solo Sixty · St Katharine's Solo Sixty St Katharine's — atrium interior
(01) — The brief

A waterfront fitness studio in a landmark office building.

Alpine MI was appointed to deliver the complete fit-out of Solo Sixty's St Katharine's Dock location at Tower Hill E1 — a 2,099 sq ft boutique fitness studio set within an office building on one of London's most distinctive waterfront developments. The 9-week programme required precise coordination with building management and neighbouring office occupiers, with all works managed within controlled operating hours including weekends.

The brief demanded the same premium finish standard established across the Solo Sixty estate, delivered in a compressed programme within an occupied commercial environment. Alpine MI managed every trade from first fix through to final handover — coordinating M&E, bespoke joinery, specialist finishes and wet room installation in a single, structured sequence.

(02) — Fit-outPremium finish

A waterfront studio finished to standard

The St Katharine's Dock location presented a unique setting — a waterfront office building with exceptional views and high footfall from surrounding residential and commercial tenants. The fit-out was designed and delivered to match Solo Sixty's premium brand benchmark, with bespoke joinery, specialist lighting, premium flooring and wet room facilities all completed within the 9-week programme.

Bespoke joinery throughout Specialist lighting scheme Premium flooring finishes Wet room installation Full M&E coordination Brand-standard delivery
St Katharine's — recovery room Recovery · Room
St Katharine's — recovery facilities Recovery · Facilities
(03) — AmenitiesMember spaces

Recovery and changing — considered

The recovery and changing suite was specified to the same level as the main studio — premium tile selection, matte black hardware, consistent joinery language and integrated lighting throughout. The space was designed to support the full Solo Sixty member journey, from studio floor to recovery, with every transition point finished to the same exacting standard.

Premium tile selection Matte black hardware suite Integrated changing Recovery facilities Consistent joinery language Member journey considered
(04) — LogisticsOffice building · City

Occupied office, nine weeks

Works were managed within a live office building at St Katharine's Dock, with deliveries, access and trade coordination aligned to building management protocols. The 9-week programme incorporated weekday and weekend working, with strict noise and dust management controls in place throughout to protect neighbouring tenants. The scheme was handed over on programme, ready for Solo Sixty's opening day.

Live office environment Building management liaison Weekend programme Controlled access routes Noise & dust management Handover on programme
St Katharine's — final handover view Final · Handover
(N° 01) — Area 2,099ft² Full boutique fitness fit-out within a waterfront office building, Tower Hill E1.
(N° 02) — Programme 9wks Weekday and weekend working — first fix to handover in nine weeks.
(N° 03) — Location E1· St Katharine's Dock — London's landmark waterfront development, Tower Hill.
(N° 04) — Completion Q2'26 Handed over on programme, ready for immediate trading.
← Back to index (05) — Next project

Solo Sixty
Fleet Street

SectorLeisure · Fitness
LocationFleet Street · EC4
Area592 ft²
Year2025

Let's build
something.

Registered office

180 Bexley Road Eltham, London England, SE9 2PH

Coverage

London South East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & Wales Privacy  ·  Terms  ·  by tgmedia.uk