Solo Sixty,  Moorgate.

N° 08 — EC1 Solo Sixty · Moorgate Solo Sixty Moorgate — studio exterior
(01) — The brief

A boutique fitness studio built for the City.

Alpine MI was appointed as main contractor to deliver the complete fit-out of Solo Sixty's Moorgate EC1 location — a 3,500 sq ft boutique fitness studio set within a residential building in the heart of the City. The brief demanded a high-specification interior capable of meeting the brand's premium aesthetic while navigating the logistical constraints of a residential-occupied building.

The 12-week programme ran weekdays and weekends, with works carefully managed to protect residents and neighbouring occupiers throughout. Every element — from structural alterations and M&E integration to bespoke joinery and premium finishes — was delivered in sequence by Alpine MI's in-house team, coordinating all trades under a single programme.

(02) — Fit-outPremium finish

Boutique fitness, built to brief

The completed studio demonstrates Alpine MI's ability to deliver high-specification leisure and fitness environments within constrained urban settings. Bespoke joinery, premium flooring, specialist lighting and full M&E integration were coordinated across the 12-week programme — with every trade sequenced to maintain progress across a split-level floor plan requiring structural intervention.

Bespoke joinery throughout Premium flooring finishes Specialist lighting scheme Full M&E integration Structural alterations Split-level floor plan
Solo Sixty Moorgate — studio fit-out detail Studio · Fit-out detail
Solo Sixty Moorgate — interior layout Interior · Layout
(03) — LogisticsOccupied building

Residential building, zero disruption

Works took place within a residential-occupied building in Moorgate, requiring detailed coordination with building management and residents throughout. Deliveries, material movement and trade access were managed through restricted routes, with weekend working incorporated into the programme to maintain handover dates without extending the build period.

Resident liaison · daily Controlled access routes Weekend programme Delivery scheduling Building management coordination Noise & dust management
(04) — AmenitiesMember experience

Every space finished to standard

Beyond the main studio floor, the project encompassed full wet room and changing facilities, reception and retail areas, and back-of-house infrastructure. Each space was finished to the same premium specification — consistent material palette, lighting treatment and joinery detailing throughout. The finished scheme was handed over ready for immediate trading.

Wet rooms · changing Reception · retail Back-of-house services Consistent material palette Ready for immediate trading 12-month aftercare included
Solo Sixty Moorgate — amenities and changing Amenities · Changing
(N° 01) — Area 3,500ft² Full boutique fitness fit-out within a residential building, Moorgate EC1.
(N° 02) — Programme 12wks Weekday and weekend working — full fit-out to handover.
(N° 03) — Sector S/02· Leisure and fitness — part of the growing Solo Sixty estate across the City.
(N° 04) — Completion Q4'25 Handed over on programme, ready for immediate trading.
← Back to index (05) — Next project

Office
South London

SectorWorkplace
LocationSouth London
StatusCompleted
Year2022

Let's build
something.

Registered office

180 Bexley Road Eltham, London England, SE9 2PH

Coverage

London South East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & Wales Privacy  ·  Terms  ·  by tgmedia.uk