00
Alpine MI · Royal London HospitalCase study · 2026
Alpine MI · Est. 2022sales@alpinemi.co.uk
(N° 19) ProjectDental Department
SectorWorkplace · Healthcare
LocationE1
Programme10 weeks

Royal London,Hospital.

N° 19 — E1The Royal London HospitalThe Royal London Hospital skyline
(01) — The brief

A modern dental department, built for clinical performance. Bright, hygienic and compliant.

Alpine MI delivered the complete fit-out of a new dental department within The Royal London Hospital, one of the UK’s busiest NHS hospitals. The project demanded meticulous planning, healthcare-approved materials and strict compliance throughout.

Treatment rooms, clinical support areas and circulation spaces were constructed and fitted out around the needs of healthcare professionals and patients, creating a durable and fully operational department.

(04) — Access and finishesDurable + accessible

Healthcare durability, through every corridor

High-performance welded vinyl flooring creates a seamless, non-porous and slip-resistant finish throughout. Fire-rated door sets, vision panels, safety handrails and accessible circulation details support safe movement through the completed department.

Welded vinyl flooringSlip-resistant finishFire-rated doorsVision panelsSafety handrailsAccessible circulation
Royal London Hospital dental department corridorRoyal London Hospital · Accessible corridor
Completed dental surgery at Royal London HospitalRoyal London Hospital · Dental surgery
(03) — M&E infrastructureIntegrated services

Specialist infrastructure, coordinated room by room

The complete mechanical and electrical installation included power, lighting, emergency systems, dental equipment supplies, hot and cold water, waste connections and specialist clinical sinks. Services were positioned for maximum operational efficiency while keeping rooms clear and uncluttered.

Specialist power suppliesClinical lightingEmergency systemsHot and cold waterWaste connectionsDental equipment coordination
(02) — Clinical fit-outHealthcare approved

Treatment spaces, planned around clinical workflow

Alpine MI constructed treatment rooms, support areas and circulation spaces using robust hygienic finishes selected to withstand daily cleaning and infection-control procedures. Bespoke cabinetry and work benches provide durable, easy-to-clean clinical workspaces.

Treatment roomsClinical support areasHygienic wall finishesBespoke cabinetryClinical work benchesInfection-control detailing
Royal London Hospital clinical dental roomRoyal London Hospital · Clinical fit-out
(N° 01) — Floor area2,000ft²New clinical dental department.
(N° 02) — Programme10weeksComplete internal fit-out.
(N° 03) — EnvironmentNHS·Live healthcare setting.
(N° 04) — LocationE1·Whitechapel, London.
← Back to index (05) — Next project

Energie
Fitness Woolwich

SectorLeisure
LocationWoolwich · SE18
StatusCompleted
Year2026

Let's build
something.

Registered office

180 Bexley RoadEltham, LondonEngland, SE9 2PH

Coverage

LondonSouth East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & WalesPrivacy  ·  Terms  ·  by tgmedia.uk