Office,  South London.

N° 07 — SE London Office · SE Office South London — glazed meeting room and open-plan workspace
(01) — The brief

A complete workplace fit-out, built for immediate occupation.

Alpine MI was appointed to deliver the complete fit-out of this modern office space, creating a high-quality working environment designed to support productivity, collaboration, and day-to-day wellbeing. The project included the construction of a contemporary open-plan office, a premium staff kitchen, and high-specification bathroom facilities, with every element carefully considered to achieve a seamless balance of functionality and design.

Throughout the programme, close attention was given to detailing, finishes, and the integration of building services to ensure a refined and practical workspace. The completed fit-out provides a professional, design-led environment that combines comfort, durability, and modern aesthetics — delivered to the highest standard and ready for immediate occupation.

(02) — WorkspacePremium fit-out

A workspace built around the people in it

The open-plan floor is framed by a made-to-measure glazed partition system that separates the meeting room without closing the space. The partition is a full-height Crittall-style steel frame with integral privacy film — drawn to the structural grid and installed in a single programme alongside the flooring, joinery, and M&E. The 8-week programme covered everything from first-fix to final handover with no client-side contractor management required.

Premium joinery throughout Made-to-measure glazed partition Bespoke lighting scheme Premium flooring finishes Integrated M&E · first fix to commission Ready for immediate occupation
Premium staff kitchen with exposed brickwork and glazed partition Kitchen · Exposed brick + glazing
Kitchen area with bespoke timber door and Crittall screen Utility corridor · Custom doors
(03) — LogisticsOccupied building

Urban site, residents throughout

The project was delivered on the ground floor of a residential apartment building within a densely populated urban setting, presenting a number of logistical and operational challenges throughout the programme. Limited access, restricted loading areas, and the close proximity of residents required careful planning of deliveries, material handling, and day-to-day site activities.

Maintaining positive relationships with occupants was a key priority, with noise, access, and site operations managed sensitively to minimise disruption. Through detailed coordination and proactive communication, the project was successfully delivered while ensuring the building remained fully operational for residents throughout the works.

Coordination · residents & building management Occupied residential building Working hours · 08:00–16:00 Managed delivery & logistics schedules Restricted access · material movement Daily housekeeping & noise controls
(04) — AmenitiesHigh-specification

Bathrooms finished to residential standard

The bathroom facilities were specified and finished to a premium residential standard — full floor-to-ceiling marble-effect tiling, a matte black Crittall-style shower enclosure with rainfall head, and a green geometric feature wall that anchors the shower room. The vanity suite carries the same matte black hardware language throughout: circular mirror, wall-hung WC, and concealed cistern. Every trade was coordinated and completed within the single 8-week programme.

Floor-to-ceiling marble tiling Green geo feature wall Matte black Crittall shower frame Rainfall head · concealed valve Matte black sanitaryware suite Circular mirror · wall-hung WC
Premium walk-in shower with green geometric feature wall and matte black Crittall frame Shower room · Feature wall
(N° 01) — Area 1,010ft² Complete workplace fit-out — open plan, meeting room, kitchen and bathrooms.
(N° 02) — Programme 8wks First fix to handover — 08:00–16:00 weekdays within an occupied building.
(N° 03) — Partition 1· Full-height Crittall-style glazed partition — drawn, supplied and installed in-programme.
(N° 04) — Rooms 4+ Open plan, meeting room, premium kitchen, and high-specification bathrooms.
← Back to index (05) — Next project

Solo Sixty
St Katharine's

SectorLeisure · Fitness
LocationTower Hill · E1
Area2,099 ft²
Year2026

Let's build
something.

Registered office

180 Bexley Road Eltham, London England, SE9 2PH

Coverage

London South East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & Wales Privacy  ·  Terms  ·  by tgmedia.uk