(N° 01) ProjectKÖD Soho
SectorHospitality
LocationSoho · W1
Completed2024

Soho.

N° 01 — Soho KÖD Soho KÖD Soho — main dining room
(01) — The brief

A FRESH VISION, FOR A SOHO DINING SPACE.

The brief was direct — turn a tired Soho frontage into a working restaurant for a returning operator. Building consent, period fabric to preserve, neighbours on three sides, and a hard date to open against a marketing programme already in motion.

We led the project from RIBA Stage 2 in-house: planning approvals, joinery, finishes and M&E coordination. The result is a room that reads as if it has always been there — and a kitchen and pass that run at full hospitality tempo.

(02) — JoineryIn-house workshop

A BESPOKE BAR BUILT AND INSTALLED BY US

A 20mm marble top was selected to give the bar a refined, contemporary appearance. The marble was precision machined to the project's exact specifications before being expertly fitted on site, with every detail carefully considered to achieve clean lines, seamless joints and a high-quality finish that elevates the overall interior.

20mm precision-machined marble bar top Integrated under-counter refrigeration Integrated LED bar lighting Porcelain tiled flooring throughout Bespoke metal shelving Seamless on-site installation and finishing
bar front detail Bar carcass · Stage 5
Original plasterwork retained Original plasterwork · Retained
(03) — Original fabricGrade II · Conservation

Working around the building

The ceiling cornice, two original chimney breasts and a section of panelled wall were retained and consolidated rather than replaced. Planning consent was led in-house, with the Westminster conservation officer attending three site visits across the programme.

LBC — Westminster Cornice consolidation Original chimney breast Lime plaster — patched Sash window repair Floorboards — lifted & relaid
(04) — Programme22 weeks total

Phased to a hard opening date

Marketing was in market eight weeks before practical completion. We back-built from the date, sequencing M&E first-fix to free up the original fabric for late-programme consolidation. The kitchen handed over a week clear of the soft launch.

Wk 01–04 · Strip-out Wk 05–10 · M&E 1st fix Wk 08–14 · Joinery Wk 12–18 · Finishes Wk 19–21 · Commissioning Wk 22 · Snag & handover
Finished dining room Dining room · Handover
(N° 01) — Area 410 Across two trading floors plus back-of-house kitchen and prep.
(N° 02) — Programme 22wks RIBA 4 → handover. Soft launch one week ahead of contract date.
(N° 03) — Trades 17+ All sequenced in-house across joinery, finishes and M&E.
(N° 04) — Covers 74+bar Plus an 18-seat lounge and 12-seat bar — designed to flex by service.
← Back to index (05) — Next project

Revolve
Brasserie

SectorHospitality
LocationLiverpool Street · EC2
StatusCompleted
Year2024

Let's build
something.

Registered office

180 Bexley Road Eltham, London England, SE9 2PH

Coverage

London South East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & Wales Privacy  ·  Terms  ·  by tgmedia.uk