Alpine MI · Hackney TapCase study
Alpine MI · Est. 2022 sales@alpinemi.co.uk
(N° 13) ProjectHackney Tap
SectorHospitality
LocationE8
Programme12 weeks

Hackney,Tap.

N° 13 — E8Hackney TapHackney Tap
(01) — The brief

A listed bank, reworked for hospitality. Heritage retained.

Alpine was appointed to deliver the structural refurbishment and interior fit-out of the historic former Midland Bank building on Mare Street, transforming it into Hackney Tap for the Bloomsbury Group.

The scheme converted a rigid cellular bank into a fluid hospitality venue with 24 beers on tap, an integrated commercial kitchen, open-plan seating and new high-specification washrooms.

(02) — Fit-out12-week programme

Craft hospitality, inside a heritage shell

Deep midnight-blue panelling, restored parquet, polished screed and bespoke oak seating create a rich interior language around the building’s original arched windows.

Heritage panellingBespoke oak seatingBrass footrailsRestored parquetPolished screedOpen-plan seating
Hackney Tap — project detailHackney Tap · Project detail
Hackney Tap — project detailHackney Tap · Project detail
(03) — MezzanineBespoke steel

An operational hub,made to perform

The centrepiece of the venue is a fully bespoke timber bar, designed and handcrafted specifically for the space. Featuring intricate timber detailing, a durable stainless-steel worktop, integrated extraction system and jade-green glazed tiled finishes, the bar combines traditional craftsmanship with modern hospitality functionality. Carefully considered in both design and construction, it creates a striking focal point that enhances the character, flow and overall guest experience of the venue.

Bespoke steel frameDesign and fabricationStructural coordinationAdditional floor spaceIntegrated installationOpen-plan retained
(04) — ConservationGrade II listed

Modern infrastructure, heritage protected

Every intervention was planned around the listed structure. Original features, including the brass plaque marking Tesco’s first bank account, were preserved and incorporated into the finished space.

Listed-building constraintsConservation coordinationOriginal features retainedHistoric plaque protectedModern services integratedCareful structural work
Hackney Tap — project detailHackney Tap · Project detail
(N° 01) — Area1,800ft²Project floor area.
(N° 02) — Programme12weeksPlanned project delivery.
(N° 03) — Role01teamMain contractor.
(N° 04) — LocationE8·London and the South East.
← Back to index (05) — Next project

Leafy
Elephant

SectorHospitality
LocationWokingham · RG40
StatusRestaurant & bar
Programme10 weeks

Let's build
something.

Registered office

180 Bexley Road Eltham, London England, SE9 2PH

Coverage

London South East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & Wales Privacy  ·  Terms  ·  by tgmedia.uk