Alpine MI · Darwin BrasserieCase study
Alpine MI · Est. 2022 sales@alpinemi.co.uk
(N° 12) ProjectDarwin Brasserie
SectorHospitality
LocationEC3
Programme5 days

Darwin,Brasserie.

N° 12 — EC3Darwin BrasserieDarwin Brasserie
(01) — The brief

Natural timber, restored to perfection.

We delivered a complete timber floor refurbishment that revitalised the restaurant’s luxury interior. The existing floor was carefully sanded back to bare timber before receiving a premium natural wood stain that enhanced the richness and character of the grain.

A durable commercial-grade protective coating completed the restoration, creating a warm, timeless finish designed to withstand the demands of a busy, high-end hospitality environment.

(02) — RestorationSanding + stain

A natural finish, built for hospitality

The restored timber flooring preserves the warmth and authenticity of the existing material while delivering the resilience required for daily restaurant service.

Professional timber sandingExisting floor restorationPremium natural wood stainCommercial-grade coatingHigh-footfall durabilityWarm contemporary finish
Darwin Brasserie — project detailDarwin Brasserie · Project detail
Darwin Brasserie — project detailDarwin Brasserie · Project detail
(03) — Live environment08:00–16:00

Precision delivery. Seamless reopening.

All sanding, staining and finishing works were completed during the restaurant's planned five-day closure. Careful planning and efficient project management ensured the floor was fully restored, allowing the restaurant to reopen on schedule with a seamless finish.

Planned five-day closureFast-track refurbishmentCarefully managed scheduleOn-schedule reopeningComprehensive dust controlCoordinated multi-trade delivery
(04) — CoordinationChristmas period

A five-day programme, carefully controlled

Restricted access, coordinated deliveries and the movement of specialist equipment through trade areas required precise planning with restaurant management and the building operations team.

Restricted accessTrade areasManaged deliveriesBuilding operations liaisonRestaurant coordinationFive-day completion
Darwin Brasserie — project detailDarwin Brasserie · Project detail
(N° 01) — Area1,800ft²Project floor area.
(N° 02) — Programme5daysPlanned project delivery.
(N° 03) — Role01teamFlooring contractor.
(N° 04) — LocationEC3·London and the South East.
← Back to index (05) — Next project

Hackney
Tap

SectorHospitality
LocationHackney · E8
StatusBar & restaurant
Programme12 weeks

Let's build
something.

Registered office

180 Bexley Road Eltham, London England, SE9 2PH

Coverage

London South East
Accreditations & Memberships
CHAS accreditation
Constructionline accreditation
SafeContractor certification
© Alpine MI · Co. No. 13895571 · England & Wales Privacy  ·  Terms  ·  by tgmedia.uk